Loading page...
Back to the top of the page
Contact


    Barcaldine Hatchery, Argyll, UK

    GRP Elevated Platforms

    Project Overview

    Designed to suit the needs of busy aquaculture and other marine environments, our non-corrosive, non-conductive, and anti-slip d² Dura Grating Mini Mesh and d² Dura Profile combined perfectly to support this client’s need for safe access platforms at this hatchery project.

    Building upon our successful collaboration with Scottish Sea Farms on a previous elevated platform project, we were approached to design and supply a challenging set of GRP access structures. This time, the project called for the creation of two platforms—one at the Vacuum Waste and the other at the On-Growing RAS — each addressing critical safety and access needs for sensor maintenance and cleaning.

    The engineer at Scottish Sea Farms emphasised the importance of maintaining adequate headroom, as the platforms were situated above areas frequented for equipment access. Consequently, all structural supports needed to be top-mounted, ensuring unimpeded access for personnel below.

    In close collaboration with the engineer, our team provided comprehensive design and engineering support, leveraging CAD expertise to devise central overhead up-and-over supports tailored to the project’s unique specifications.

    Our data-driven approach ensured that the walkways below both platforms met the structural requirements but remained unobstructed, resolving any potential headroom issues while positioning the access safety ladders in non-traffic areas.

    With the expertise of our design team, the project unfolded seamlessly, culminating in the successful deployment of our d² Dura Grating and Profile products. These solutions not only guarantee longevity but also boast anti-slip, non-corrosive, and non-conductive properties, offering a safe and reliable elevated platform solution tailored to the hatchery’s needs.

    From the early stages through to delivery and after-care, the core project team of Joanne and Dean were professional, knowledgeable and had a ‘can do’ attitude that took the initial concept of the platforms through to completion. The quality and fit of Dura platforms is second to none. With easy to install sections and all the materials supplied (bolts, nuts, rivets etc.), the platforms were installed in no time at all. The photos really do not do the platforms justice in how they have improved the accessibility and safety of the areas in which they’re positioned.

    Anthony Robinson

    Multi-skilled Engineer for Scottish Sea Farms

    PA37 1SE

    Our Specialists

    Our innovative recyclable products can help accelerate the construction of maritime infrastructure and leisure projects. Talk to our experienced team about your project.