Riser installation with excellence and proficiency
Building Services Company Briggs and Forrester were appointed as the M&E contractor for Phase 1 of Embassy Gardens and chose Dura Composites for the complex job of installing secondary supports to allow cut outs to be made to the various GRP grating riser platforms already in situ.
Prior to Dura Composites surveying the site and making their recommendations, no provision had been made for the service supports needed for mechanical and electrical services to pass through on various floor levels whilst still maintaining the integrity of the riser.
The Dura Composites Riser Installation Team carried out the required work quickly, proficiently and to a high standard and in accordance with all required Health & Safety criteria.
Dura Riser Flooring offers a versatile solution suitable for all building types. Its lightweight and non-conductive properties make it an ideal choice, ensuring easy installation without the need for hot works permits. Beyond its adaptability, our riser and smoke shaft flooring provides immediate protection, promoting efficiency and safety at all stages of the building’s construction.