Riser void coverings delivered to site ready-made.
d² GRP Dura Grating has lower installation costs than steel and can be up to 80% lighter, so when used with our cast in riser modules, it can be easily manually handled into position, eliminating the need for heavy lifting equipment.
It is easily adapted to suit services passing through floors and can be easily cut on site using standard hand power tools without the need for hot works permits.
The leave-in-place alternative to post-pour fixing.
Over 2000 Dura Riser Void Coverings have been supplied to the Elephant Park project to date. The cast in modules and GRP grating are a safer, leave-in-place alternative to post pour fixing and can be pre-fabricated to suit the individual measurements of each riser void. We provide full design capabilities with PI insurance for the design and can also provide contract installation.
Dura Composites products were selected for this phase of Elephant Park by AJ Morrisroe & Sons, specialists in civil engineering, ground works and sub and superstructure RC frame construction.