Elephant Park is a new mixed-use development in Elephant & Castle, London SE17 and is one of London’s largest regeneration schemes. The project is being completed in multiple phases and is a partnership between Lendlease and Southwark Council.
Morrisroe were awarded the contract for the concrete construction of the buildings at plots H04 and H05 and chose Dura Composites GRP Riser Solutions as a safe and structural flooring for the service risers.
GRP Dura Grating has lower installation costs than steel and can be up to 80% lighter, so when used with our cast in Dura Box, it can be easily manually handled into position, eliminating the need for heavy lifting equipment. It is easily adapted to suit services passing through floors and can be easily cut on site using standard hand power tools without the need for hot works permits. Over 2000 Dura Riser Void Coverings have been supplied to the Elephant Park project to date.
Dura Composites products were selected for this phase of Elephant Park by AJ Morrisroe & Sons, specialists in civil engineering, ground works and sub and superstructure RC frame construction.