Unique GRP duct cover boosts safety.
This marina is situated on the south coast of England within the River Hamble which flows into the northeast side of Southampton Water. It is a modern marina which benefited from a multi-million pound upgrade to its boatyard in 2014. Dura Composites products were selected for this project by Walcon Marine, one of the global leaders in the design & construction of marinas.
The Marina was constructed in the late 1960’s when boats were smaller and narrower, meaning the current pontoons did not meet modern industry standards. Now the marina owner is investing further to create an additional 59 berths, upgrade the pontoons and construct a new bridgehead.
Dura Composites’ customer Walcon Marine was responsible for the staged removal of the old pontoons and the supply and installation of 976 metres of walkways and 148 finger pontoons to provide berths for 297 boats. With a particularly high specification needed for the project, Walcon worked with Dura to develop a new Glass Reinforced Plastic (GRP) Duct Cover design which is a first in the marketplace and which offers a clean, anti-slip, non-corrosive and durable finish.