Quick and easy GRP panel install with minimal disruption.
Connecting Orton Meadows and Thorpe Park, this bridge is regularly used by those enjoying this popular recreation area. The Environment Agency (who look after the lock bridge) highlighted the need for replacement of the wooden timber deck that had seen better days, and looked to GGP Consult and AMCO Giffen to design and install a solution that would minimise disruption.
Dura Slab Easy Lift 100’s narrow format achieves required span.
Having worked with Dura Composites before and having a good understanding of the benefits of our products, the companies turned to our GRP Specialist team to helped them narrow down the right product for the specific needs of this wide span bridge. With the planned closure of the bridge scheduled for just 6 weeks, the engineers needed a deck solution that was quick and easy to deploy.
They chose our unique GRP Dura Slab Easy Lift product which was compliant with the various project parameters including pedestrian loading, self weight criteria and a long design life. The special narrow format of the Easy Lift design allowed for manual lifting and therefore totally revolutionised the approach to installation and the closure time frame. The refurbishment was finished off with dome washers and end caps were added to provide a neat finish and prevent unwanted animal nesting.