Project Overview
Situated on the banks of the Salcombe Estuary in South Devon, East Portlemouth is a picturesque coastal village where direct access to the water is an essential part of daily life. For waterfront properties with private boathouses, reliable slipways provide the vital connection between land and sea.
This project centred on the refurbishment and extension of a historic private slipway used to launch and recover a rigid inflatable boat (RIB), alongside kayaks and stand-up paddleboards.
The original concrete slipway, believed to have been constructed during the Second World War, had previously been resurfaced with granite setts. However, the mortar used during that refurbishment was not suitable for continual exposure to the marine environment. Years of repeated tidal immersion and drying had caused the mortar to deteriorate, allowing the granite setts to become loose and creating an increasingly uneven and hazardous surface.
Beyond the existing slipway, access continued across exposed shoreline rock. Although sections of the rock had been cut away to create a channel, the naturally uneven surface meant boats could only be launched or recovered safely around higher states of the tide. This restricted access to the boathouse for much of the day and limited the usability of smaller craft.
The client wanted a long-term solution that would extend the slipway onto the beach below, creating safe, reliable access throughout almost the entire tidal cycle while standing up to one of the harshest operating environments imaginable.