    Orient Way Traincare Depot, London, UK

    Low Carbon GRP Walkways and Access Platforms

    Background image

    Project Overview

    Strategically located between Stratford and Lea Bridge, Orient Way is a key traincare depot in Greater Anglia’s network. Operating 24/7 and spanning the area of three football pitches, the facility plays a vital role in servicing, cleaning and replenishing the operator’s fleet.

    To support the arrival of Greater Anglia’s new Class 720 and Class 745 trains, the depot required a significant infrastructure upgrade. The objective was to scale the facility to safely and efficiently accommodate the new train units across all twelve sidings — part of a wider £1.4 billion investment in modernising East Anglia’s rail services.

    IPS Design & Consultancy led the design process across GRIP 3 to 5 stages. Pod-Trak, acting as Principal Contractor, delivered a complex package of civil, mechanical, and electrical works within a live depot environment.

    Dura Composites was selected to supply a coordinated range of high-performance Glass Reinforced Polymer (GRP) products, including walkways, access platforms, safety handrailing and the patented Dura Envirosump system.

    A key factor in the client’s decision was the low embodied carbon and fully recyclable nature of d² Dura Grating materials. Their seamless integration with the Dura Envirosump enabled compliant front-of-train washing without the need for new drainage civils — reducing both environmental impact and construction complexity.

    Scope of Works

    • Installation of low-carbon d² Dura Grating trackside walkways
    • Fabrication and supply of Driver Access Platforms (DAPs)
    • Supply of d² Dura Keyclamp GRP handrailing
    • Supply of Dura Envirosump liquid containment system

    Integrated GRP Solutions for Depot Resilience

    As part of this critical depot upgrade, Dura Composites delivered a package of fully engineered GRP solutions tailored for a safety-critical, operational rail environment:

    d² Dura Grating Walkways

    Installed across the depot to create low-maintenance, fire-rated, anti-slip access routes for staff working in fuelling, servicing, and inspection zones.

    • Validated against point loads and wheel loads from sanding carts
    • Engineered for durability, slip resistance and compliance
    • Lightweight for fast installation with minimal plant

    Driver Access Platforms (DAPs)

    Also known as Driver Hop Ups, these GRP access structures were custom-fabricated to support safe driver changeovers and inspections.

    • Delivered fully assembled to site for rapid deployment
    • Engineered to meet spatial and operational constraints

    Dura Envirosump (Patented Liquid Containment System)

    A purpose-designed GRP system that captures run-off from train washing without disturbing the permanent way.

    • Integrated with d² Dura Grating for seamless operation
    • Configurable for both buffer end and London end layouts
    • Captures silt, mud, and detergent residues in lockable containers
    • Accessed using a standard railway carriage key
    • Supplied in green for visual demarcation and safe zoning alongside yellow walkways and DAPs

    Designed for Safety, Sustainability and Speed

    The Orient Way upgrade presented a range of challenges — from restricted access and limited historical records to live interfaces with rolling stock. Dura Composites’ d² GRP systems delivered clear advantages:

    • Safe: Non-conductive and anti-slip, ideal for electrified depot environments
    • Sustainable: Fully recyclable, corrosion-resistant, and long-lasting
    • Speedy: Supplied in pre-assembled formats to reduce install time and programme risk

    Supporting a Greener Rail Network

    Dura Composites is proud to support the Network Rail Decarbonisation Programme through the supply of recyclable, low-carbon materials that make infrastructure delivery faster and more sustainable.

    Compared to traditional materials, d² Dura Grating offers:

    • Up to 33% reduction in embodied carbon
    • Full recyclability at end of life
    • Carbon savings without compromise on performance

    Our in-house Carbon Calculator tool provides verified data to support ESG reporting, enabling evidence-based decisions that align with project sustainability goals.

    Client

    Greater Anglia

    Principal Contractor

    Pod-Trak

    Lead Designer

    IPS Design & Consultancy

    Products

    Driver Access Platforms
    Trackside Walkways
    Safety Handrailing
    d² Dura Grating
    Dura Envirosump

    Services

    Design & Engineering
    Fabrication & Build
    Install Consultation

    Orient Way is a great example of how composite innovation can futureproof rail infrastructure. By supplying lightweight, prefabricated GRP walkways, driver platforms, and washdown catchment systems, we helped Pod-Trak deliver a complex live-depot upgrade efficiently and safely. The result is a more resilient facility aligned with modern operational and environmental expectations.

    Melissa Warren

    Rail Project Manager at Dura Composites

    orient way traincare depot

    Our Specialists

    We’re helping to answer the major challenges facing Britain’s railway network such as capacity, reliability and efficiency. Talk to our experienced team about how you can tap into our specialist knowledge and engineering capability for your project.

    Offshore Wind Farm