A Jetty for a New Generation of Lifeboats
The station’s capabilities were recently strengthened with the arrival of two new lifeboats: The Bertien and The Georgine. Together, they represent the most advanced fleet in the station’s history.
To support the new vessels, a completely new jetty was required, providing volunteers with a direct, dependable route from the boathouse to the water.
Safety Proven by Independent Testing
Safety was the defining requirement throughout the project.
Volunteers and permanent staff need to reach the lifeboats quickly in all weather conditions, making reliable slip resistance and long-term durability essential. The jetty is continually exposed to freshwater, with walking surfaces frequently wet as crews respond to emergency callouts throughout the year. In these conditions, the structure also needed to resist corrosion and maintain its performance over the long term with minimal maintenance.
Equally important was confidence that the specified products would perform as required in a demanding marine environment.
d² Dura Grating was selected because it combined proven anti-slip performance, excellent corrosion resistance, anti-slip properties, and a lower embodied carbon footprint than alternative materials.
Designed for Reliable Emergency Response
The completed 136m² jetty was constructed using 45mm d² Dura Grating. Alongside the grating, Dura’s exclusive Netherland’s partner BFF Trading supplied 32 metres of d² Fender Profile and 28 metres of d² Dura Tread Nosing, with installation completed by Van den Biggelaar Grond- en Waterbouw in spring 2026.
The lightweight composite construction reduces structural loading while providing a robust, slip-resistant walking surface that enables volunteers to move safely and quickly between the boathouse and lifeboats whenever they are called into action.
Supporting Lifesaving Operations for the Future
For almost four decades, KNRM Marken has relied on volunteers being able to launch at a moment’s notice.
Today, with a modern fleet and jetty walkway working together, the station has infrastructure designed to support fast, safe emergency response for many years to come. Built to withstand continual exposure to the freshwater marine environment while requiring minimal maintenance, the new jetty provides a dependable long-term solution that matches the dedication of the volunteers who use it.