Project Overview
As part of the Dogger Bank B phase of the world’s largest offshore wind farm, Hitachi Energy appointed Dura Composites to supply low embodied carbon, high-performance GRP trench covers for the new high-voltage cable infrastructure at the onshore converter station in East Riding.
To support safe and reliable energy transmission, GRP d² Dura Slab Type 75 trench covers were installed across outdoor cable trenches and conduits – specified in dark grey with D400 and C250 load ratings to withstand heavy-duty operational demands. In addition, green d² Dura Grating Solid Top trench covers with A15 rating were used in designated pedestrian areas, enhancing visibility and compliance with site zoning requirements.
To further improve on-site safety, 12mm Dura Tread Solid Plate anti-slip panels were fitted in key walkways, offering exceptional underfoot grip in all weathers.
The innovative GRP covers are compatible with a wide range of trench types, including precast flat top and recess-formed concrete troughs, and feature integrated manual lifting eyes for easy removal during maintenance. Their high strength-to-weight ratio makes them ideal for this critical energy site, where accessibility and safety are paramount.