+44 (0)1255 423 601 info@duracomposites.com

Composite Decking Installed At 5 Star Dubai Hotel

Brief:

This 5 star hotel in Dubai required a long lasting, hard wearing deck for new landscaping renovations. The level of the deck required raising to around 350mm and the deck needed to withstand the extreme temperatures synonymous with the Middle East.

Solution:

The client was thrilled with the installation of 295mm Dura Deck in charcoal. Dura Composites supplied Dura Profile wide flange FRP as bearers, then WPC joists and finally the 295mm decking to provide the strength required and achieve the desired level. Around 900m2 of Dura Deck was supplied in various locations throughout the hotel grounds for guests to enjoy.

Pictures from Dubai Hotel Installation

dura-deck-proj-dubai1

dura-deck-proj-dubai2

dura-deck-proj-dubai3

5 Star Dubai Hotel

dura-deck-proj-dubai5